亚洲国浯有码免费视频_91精品国产全国免费观看蜜桃_太深了好爽亚洲一区av_国产又粗又大的成人片Av在线

Communication Engineering
Hainan Launched the third 750kV line project from Xining to Hele to Tala

1632451785867958.jpg1632451799123873.jpg

The total length of the tala-Qingnan-Xining three-way power transmission project is 455.39 kilometers, with a total of 1020 tower bases. The interval between Xining and Tala substations will be expanded. Among them, Qingning Line ⅰ and Qingta Line ⅰ were put into operation first in June 2020, which was also the first time for uHV Qingnan converter station to access power. Subsequently, Qingning line ⅲ and Qingta Line ⅱ were put into operation.

It has laid the foundation for green electricity transmission of qingyu DC project.


電 話
產(chǎn) 品
短 信
聯(lián) 系